Volkswagen Plant Expansion
Chattanooga, TN
The design-build project included the addition of both a 200,000-square-foot battery assembly facility and a 575,000-square-foot body shop at the Tennessee plant for the purpose of increasing overall production of Volkswagen's electric vehicle (EV). The VW-Chattanooga location is VW's North American hub for EV manufacturing. The AC system serving this facility was over 1,700 tons and utilized packaged rooftop units for cooling and humidity control. A weld exhaust system was designed and installed to capture contaminants from the airstream. Process piping systems included natural gas, compressed air, weld water, argon, and cargon.
CLIENT
Volkswagen
GENERAL CONTRACTOR
Clayco Construction
PROJECT TYPE
Manufacturing
SIZE
200,000 SQ FT-575,000 SQ FT