Valeant Distribution

Greenville, SC

Working with the Valeant construction team, Clayco, CRG, and Forum Studio – National Design Build Services was selected early for the preconstruction phase of this Class-A pharmaceutical warehouse project. Our design included conditioned warehouse space served by (16) 25-ton packaged rooftop units that include temperature control and temperature and humidity monitoring. Each RTU system was designed to be a stand-alone entity to ensure continuous operation should any single component fail. To alleviate stratification, HVLS and “zoo” fans were installed throughout the space. The facility is equipped with a state-of-the-art DDC controls system throughout the warehouse and office areas. Parallel to the temperature controls system in the warehouse is a validated temperature and humidity monitoring system that meets the criteria of CFR Title 21, part 11. This system is provided to meet FDA requirements for electronic records and signatures and assures tight temperature and humidity control.

CLIENT

Valeant Pharmaceuticals North America

GENERAL CONTRACTOR

Clayco Construction

PROJECT TYPE

Distribution, Commercial, Life Sciences

SIZE

432,000 SQ FT