McCormick Distribution Center
Sparrows Point, MD
Project Details
Client
Tradepoint Development, LLC
General Contractor
Clayco
Size
1,800,000 SQ FT
This project includes construction of a 1,800,000-square-foot food grade, light manufacturing and distribution facility comprised of warehouse, office, central utility plant (CUP) and pre-packing spaces. The systems serving the facility will be used to condition 1,775,000 square feet of warehouse, 50,000 square feet of mezzanine and 50,000 square feet of office area, IDF rooms, specialty rooms, controlled temperature rooms, and refrigerated areas. A CUP with both hot and chilled water systems provides water to mechanical systems throughout the building. The warehouse is conditioned by air rotations units, HVLS fans, energy recovery ventilators, and RTUs. Office zones are served by VAV boxes, and RTU with a DOAS, and a makeup air unit. Additional office conditioning is provided by exhaust fans and air scrubbers. The organics storage conditioning of various zones includes a DOAS, CRAC units for MDF rooms, destratification fans for vanilla temperature-controlled rooms, CHW/HW RTUs and exhaust fans for hazmat rooms, interior energy recover ventilators, and general exhaust fans for electrical and other rooms. Central Utility Plant consist of (2) 1050 Ton Magnetic Bearing Centrifugal Chillers, (2) Marley Counter Flow Cooling Towers, (5) Fulton Gas Fired Condensing Boilers, (9) B&G Chilled water, Condenser Water & Hot water Pumps. The project consist of 32,000 LF of Chilled Water and Hot Water hydronic piping.