OGE Metro
Oklahoma City, OK
Project Details
Client
Oklahoma Gas & Electric
General Contractor
Clayco
Size
20,000 SQ FT
This very complex project required the renovation of an existing data center. Special care was needed to ensure the data center remained in operation throughout the entire renovation.
NDBS took a unique approach to the project utilizing Aquatherm piping in order to eliminate hot work welding in the existing space but still providing the leak protection that only a welded system can achieve. In addition, the piping was all buried in the existing building leading to the hardened data center.
NDBS provided a complete Tier 3 Data Center solution to the owner while maintaining the environment in the existing space, providing equipment in a hardened environment, full redundancy, all while preserving a tight schedule.